Spill
Prevention, Control, and Countermeasure Plans (SPCCs)
40
CFR Part 112 requires all facilities with bulk petroleum storage of
1,320 gallons or greater to develop and maintain a SPCC plan.
AEC’s personnel have extensive experience in designing, implementing,
and preparing SPCC plans for such locations a ready-mix concrete batch
plants, bulk fuel terminals, and commercial buildings. Due to our
extensive experience, we are able to provide our Clients with
cost-effective plans that meet the federal requirements. Our
personnel have the necessary knowledge to navigate the complex SPCC
regulations and the tools needed to prepare the plan in a timely,
cost-effective manner, allowing facility personnel to focus on the
day-to-day compliance challenges.
AEC’s
field personnel can also provide the monitoring, record keeping, and
reporting requirements – including sampling and testing – often
required to comply with this program.
|